Skip to content

RV10-Builder

N62620

  • YouTube

  • Home
  • Build Log
  • Privacy Policy

Build Log

Service Bulletins… Since I’m In Here – SB00002

JMilthaler November 1, 2022 Empennage, Vertical Stabilizer No Comments

Since I have the Vertical Stabilizer down for rework, I thought this would be a good time to complete the service bulletin for the bottom rudder hinge bracket and rudder stops (SB00002). The issue is fairly straightforward, there have been

Read more

Taking a Step Back – Time for a Re-do

JMilthaler August 22, 2022 Oops, Vertical Stabilizer No Comments
Taking a Step Back – Time for a Re-do

I’ve been slowly getting back in the shop lately and my first task was to fix the vertical stabilizer. Somewhere along the way, the leading edge was damaged in storage. It was a minor dent and really wasn’t anything to

Read more

Drilling Blind Rivets – A Lesson in Slowing Down

JMilthaler June 22, 2021 Rudder No Comments

Father’s day was this weekend and my lovely wife gave me all weekend to work on the plane (in addition to some other great gifts). So I got to riveting the rudder halves together. I used the 3M VHB tape

Read more

Back in the Saddle Again

JMilthaler March 19, 2021 Rudder No Comments
Back in the Saddle Again

Aaaaannndddd we’re back. After a long hiatus of getting used to having no free time, I finally got back into the shop to build the plane. My birthday was on Wednesday and my lovely wife gave me the best gift

Read more

Slow Progress

JMilthaler June 29, 2020 Rudder No Comments

I’ve been working on the rudder lately but progress has been a little slow. Skins are deburred, drilled, and dimpled and the stiffeners and ribs are all dimpled. Next step is to counter sink the trailing edge and then get

Read more

Getting back at it

JMilthaler May 20, 2020 Rudder No Comments

It’s been awhile since my last post. Some things in life, like celebrating being married to my beautiful wife for a decade or preparing for the new addition to our family just come *WAY* before building. I got back at

Read more

Building a plane is….. Riveting

JMilthaler May 5, 2020 Vertical Stabilizer No Comments
Building a plane is….. Riveting

I started final riveting on the vertical stabilizer this past weekend. There is definitely a bit of a learning curve to bucking rivets and this was the first bit of work where I feel like I had trouble. Some of

Read more

It’s Prime Time!

JMilthaler April 27, 2020 Vertical Stabilizer No Comments
It’s Prime Time!

Remember that priming booth I mentioned a couple weeks ago? Yeah that ended up being more of a priming tarp thrown on the ground and some plastic taped to the wall. Not the best booth, but with this COVID-19 crap

Read more

Put it together. Take it Apart

JMilthaler April 11, 2020 Vertical Stabilizer No Comments

Just when I thought I had something that looked like an airplane part, it’s time to take it all apart. Once I got everything apart, the reason became pretty clear. The plans have you deburr parts all along the way

Read more

Drill, Debur, Dimple, Repeat

JMilthaler April 6, 2020 Empennage, Vertical Stabilizer No Comments
Drill, Debur, Dimple, Repeat

One of the other builders I follow often says, “Building the RV-10 is a lot of putting something together then taking it apart.” I’m quickly realizing what he means. But… I’ve made some progress since my last post. Once the

Read more
  • « Previous

Recent Posts

  • Service Bulletins… Since I’m In Here – SB00002
  • Taking a Step Back – Time for a Re-do
  • Drilling Blind Rivets – A Lesson in Slowing Down
  • Back in the Saddle Again
  • Slow Progress
Copyright © 2025 RV10-Builder. All rights reserved.
Theme: Explore by ThemeGrill. Powered by WordPress.